S.N | Client Name,Location, Country | Name of the Project | Type of Contract (EPC, EPCC) | Execution Mode (Single or JV) – if JV name the party and Spit of responsibility | Project Description, list of the new process units & Contractor scope | Scheduled and Actual Duration of the Contract | Status | |
---|---|---|---|---|---|---|---|---|
1 | OMIFCO , SUR |
Construction Materials Shed JV |
Main Contractor | Single | Complete civil / Mechanical & External works etc |
2020* | On Going | |
2 | DAK Oman LLC ,Ghala, Oman |
Construction High rise Building Project 10 Floors |
Main Contractor | Single | Complete civil Building/ MEP/ External works etc |
2018-2020 | On Going | |
3 | Al Hassan Engineering Co., SAOG, Ghaba North Gas Compression Station Project, Oman |
Construction of OP well pad Civil Foundation-22Nos –OSE-19851/ OSE-20299 |
Sub-Contractor | Single | pre casting on plot/off plot Civil Foundation & Cast in suite foundation works |
2015-2016 | Completed | |
4 | Al Hassan Engineering Co., SAOG, Ghaba North Gas Compression Station Project, Oman |
C-31/1163 – Construction of Zauliyah gas plant Project for PDO- On plot Civil works at ZGP site-SCA REF:NO.AH912 /CONST /SCA /126 /128-00 /15. |
Sub-Contractor | Single | Civil Gas turbine Foundation / Drain Chanel/Graded Road / Fencing type A-B & other pre casting on plot /off plot Civil Foundation works |
2015- 2016 | Completed | |
5 | Al Hassan Engineering Co., SAOG, Ghaba North Gas Compression Station Project, Oman |
Construction of Zauliyah gas plant Project for PDO- On & Off plot Civil works at ZGP site -SCA REF:NO. / CONST / SCA /126 / 129-00 / 15 |
Sub-Contractor | Single | ROW for 94KM & other Civil Foundation works |
2015-2016 | Completed | |
5 | Al Hassan Engineering Co., SAOG, Ghaba North Gas Compression Station Project, Oman |
Construction of Zauliyah gas plant Project for PDO- On & Off plot Civil works at ZGP site -SCA REF:NO. / CONST / SCA /126 / 129-00 / 15 |
Sub-Contractor | Single | ROW for 94KM & other Civil Foundation works |
2015-2016 | Completed | |
6 | Bahwan Engineering Company LLC, Blue city/Adam/Sur/JBB/Mudayrib ,Oman |
Civil Work -Supply, Installation, Testing and commissioning of 10 numbers 36Kv, 20MVAr Capacitors banks for grids substations (Tender No. MZEC/10 |
Sub-Contractor | Single | Construction of Capacitor Bank Foundation 5 locations & fencing etc |
2015-2016 | Completed | |
7 | Al Hassan Engineering Co., SAOG, Harweel Power plant Project, Oman |
Construction of Harweel Power plant Project for PDO- On & Off plot Civil works at HRGS site –OSE-20459 |
Sub-Contractor - JV Al Junaibi | Single | Construction Gas turbine/ Vessel /Skid /Heavy equipment shed & other Civil Foundation works |
2015-2016 | Completed | |
8 | Bahwan Engineering Company LLC,Liwa Sohar ,Oman |
6 Bahwan Engineering Company LLC,Liwa Sohar ,Oman EPC Construction of 132kV GS substation Civil works (OETC)-132kV/ 6500001371 |
Sub-Contractor | Single | Complete civil GS building/ Transformer/ Capacitor Bank/ Duct/ Fire Pump/ Road etc |
2015-2016 | Completed | |
9 | Daleel Petroleum LLC,Daleel ,Oman |
Construction of extension camp building turnkey EPC Civil works (Daleel) |
Main-Contractor | Single | Complete civil Building/ MEP/ External works etc |
2015-2016 | Completed | |
10 | Bahwan Engineering Company LLC, Mobella, Oman |
EPC Construction of 220kV GS substation Civil works (OETC)- 220kV/6500001583 |
Sub-Contractor | Single | Complete civil GS building/ Transformer/ Capacitor Bank/ Duct/ Fire Pump/ Road etc |
2016-2017 | Completed | |
11 | Al Hassan Engineering Co., SAOG |
Ghaba North Gas Compression Station Project, Oman Construction of OP well pad -22Nos –OSE-18371 |
Sub-Contractor | Single | preparation/Supply& install of fencing gates & other pre casting on plot/off plot Civil Foundation works |
2015-2016 | Completed | |
12 | Bahwan Engineering Company LLC, Sohar ,Oman |
Construction of Camp facilities 2000Nos- ORPIC – DAELIM-PETROFAC JV |
Sub-Contractor | Single | Construction of site filling/Erection Porta Cabin/Pathway/ Equipment foundation etc |
2014-2015 | Completed | |
13 | Al Hassan Engineering Co., SAOG, SNCP Project, Qarnalam, Oman |
PO# OSE-17752 Type A & B fencing Erection works for SNCP Project - PDO |
Sub-contractor | Single | preparation/Supply& install of fencing gates & Civil Foundation works |
2014 | Completed | |
14 | SOHAR ALUMINUM Sohar Sultanate of Oman |
Cont.No#013/006 General Civil & Building Maint. Services |
Main Contractor | Single | Civil, Mechanical, E&I Engineering, Construction & Maintenance |
2013-2022 | On Going | |
15 | Al Gubrah Power & Desalination Co., S.A.O.C Muscat Sultanate of Oman |
PO#4277, Refurbishment of Culvert & CP works. |
Main Contractor | Single | EPC |
2013-2014 | Completed | |
16 | VALE OMAN Sohar Sultanate of Oman |
PO#4500796871 Construction of Contractor Facilities |
Main Contractor | Single | Construction of ware house including civil, MEP & Commissioning |
2013- 2014 | Completed | |
17 | VALE OMAN Sohar Sultanate of Oman |
PO#4500605561 On site work force services – Building Maint.. |
Main Contractor EPC | Single | Civil, Mechanical, E&I Engineering, Construction & Maintenance |
2012-2013 | Completed | |
18 | GALFAR – PDO. Yibal, Qarnalam, Lekwair, Fahud & Kauther “KFGS” North Oman |
C-31/0603 – Off plot Delivery Contract. “ODC” |
Sub-Contract under EPCC Main Contractor | Single | Civil Engineering & Contracting & Support services |
Awarded 2012 | On Going | |
19 | STS &TEBODIN - PDO. Yibal, Qarnalam, Lekwair, Fahud North Oman |
C-31/1161 – Engineering & Maintenance Contract |
Sub-Contract under EPCC Main Contractor | Single | Mechanical, E&I Engineering, Construction & Maintenance Support services |
Awarded on 11th May 2012 | On Going | |
FABRICATION OIL & GAS PROJECTS | ||||||||
20 | Gulf Petrochemical Services LLC Sultanate of Oman (J-361FB) 3-2019-080011 BP Khazzan Gas Project -GWES |
190012577 HBPDO-MAF Tank T-108 Maintenance Project |
Contractor | Single | Supply, Fabrication & Painting of Structural steel works |
2020 | Completed | |
21 | Bahwan Engineering Company LLC Sultanate of Oman (J-371FB) |
5100104637 PDO -Marmul Rationalisation Project |
Contractor | Single | Supply, Fabrication & Primer Coating of Structural Steel works |
2020 | Completed | |
22 | Bahwan Engineering Company LLC Sultanate of Oman (J-373FB) |
5100103069 PDO -EPCC Marmul & Sarmad Project |
Contractor | Single | Supply, Fabrication & Primer Coating of Structural Steel works |
2020 | Completed | |
23 | Special Technical Services LLC Sultanate of Oman (J-380FB) |
1669 WNS19039 PDO- Hanya Hydrocyclone Skid |
Contractor | Single | Supply, Fabrication & Painting of Hanya Hydrocyclone Skid structure |
2020 | On-Going | |
24 | Special Technical Services LLC Sultanate of Oman (J-387FB) |
1696 WNS20038 PDO- Yibal Khuff Well Head Skids |
Contractor | Single | Supply, Fabrication & Painting of PDO- Yibal Khuff Well Head Skid Structure |
2020 | On-Going | |
25/td> | Oman India Fertilizer Company S.A.O.C. Sultanate of Oman (J-388FB) |
8573/Civil Intender,IP |
Contractor | Single | Supply, Fabrication & Painting of Open Shed – Civil & Structural Works |
2020 | Completed | |
26 | Special Technical Services LLC Sultanate of Oman (J-390FB) |
STS/1750/PRT00071OQ-OOCEP Bisat Tanks Project |
Contractor | Single | Fabrication of Structural steel works (4 Tanks) |
2020 | On-Going | |
27 | Special Technical Services LLC Sultanate of Oman (J-339FB) |
STS/1171/PRT00040 PDO-MAF Tank T-108 Maintenance Project |
Contractor | Single | Fabrication & Logistic Services of Structural steel Plates for Tank T-108 Maintenance works |
2019 | On-Going | |
28 | Gulf Petrochemical Services LLC Sultanate of Oman (J-354FB) |
3-2019-050079OQ-OOCEP Bisat Project |
Contractor | Single | Supply, Fabrication & Painting of Structural steel works |
2019 | On-Going | |
29 | Special Technical Services LLC Sultanate of Oman (J-357FB) |
190012577 HBPDO-MAF Tank T-108 Maintenance Project |
Contractor | Single | 80MT Crane Hire Service |
2019 | On-Going | |
30 | Oiltanking Terminals & Co. LLC (OTO), Sohar Sultanate of Oman (J-327FB) |
OOT.1703 Tank T-302 (Roof Plate) Project |
Contractor | Single | Repairing works for Tank T-302 Roof Plate works |
2018 | Completed | |
31 | TIEJUN,IBRI Power Construction Co. Sultanate of Oman (J-333FB) OM003-SS-057-00 Ad-Dhahirah Generating Company – IBRI Independent |
OM002-SS-044-00 Dhofar Generating Company - Salalah II Independent Power Project |
Contractor | Single | Chemical Cleaning Service Contract for HRSG Boiler Units (4 Nos) |
2018 | Completed | |
32 | OQ-Orpic Sultanate of Oman(J-314FB) |
PO#4600003259 Online Cleaning of Fin-Fan Coolers |
Contractor | Single | Online Cleaning of Fin-Fan Coolers |
2018 | On-Going | |
33 | SEPCO III, Salalah Sultanate of Oman (J-273FB) |
OM002-SS-044-00 Dhofar Generating Company - Salalah II Independent Power Project |
Contractor | Single | Chemical Cleaning Service Contract for HRSG Boiler Units (4 Nos) |
2017 | Completed | |
34 | Bahwan Engineering Company LLC Sultanate of Oman (J-283FB |
5100066677 ORPIC-Liwa Plastic Project(Tecnimont) |
Contractor | Single | Supply, Fabrication & Primer Coating of Structural Steel works |
2017 | Completed | |
36 | Special Technical Services LLC Sultanate of Oman (J-317FB) |
STS/890/PRP00082 PDO-Yibal Rejuvenation Project |
Contractor | Single | Fabrication & Erection of Structural Steel works |
2017 | On-Going | |
37 | Larsen & Toubro (Oman)LLC Sultanate of Oman (J-219FB) |
LTO/ PTD /SAADA/ LOI/ CIV/ O13132 /33kv Grid station at Saada & Associated 132kv LILO Works |
Contractor | Single | Supply, Fabrication & Installation of Transformer sheds. |
2016 | Completed | |
38 | Arabian Oil & Gas field Services LLC Sultanate of Oman (J-205FB) |
AROGAS/ P /150139 /2016/01 MSCP Repair Project at MAF ORPIC Refinery |
Contractor | Single | Remedial Activities for the removal of Stuck Line Stopper-Civil & Mechanical Works- Cold cutting, Split Tee Welding, wrapping, flushing, N2Purging |
2016 | Completed | |
39 | Special Technical Services LLC Sultanate of Oman (J-229FB) |
STS/EPCC-Nimr/SCA-0025 PDO-EPCC Nimr |
Contractor | Single | Structural Steel fabrication |
2016 | On-Going | |
39 | Larsen & Toubro (Oman)LLC Sultanate of Oman (J-242FB) |
LTO / PTD / DA-SQ / LOI / CIV / O16132 / 33kv Grid station -Suwaiq GS, DAS GS & Associated LILO Works |
Contractor | Single | Supply, Fabrication & Installation of Transformer sheds |
2016 | Completed | |
40 | Larsen & Toubro (Oman)LLC Sultanate of Oman (J-130FB) |
LTO / PTD/ AMMAB / LOI / CIV / O14132 / 33kv Grid station, Amirat & Mabella-2 |
Contractor | Single | Supply, Fabrication & Installation of Transformer & Capacitor bank sheds |
2015 | Completed | |
41 | Occidental Mukhaizna LLC Sultanate of Oman (J-149FB) |
MUK-SO-24000057869 Oxy, Mukhaizna – MCV Flotation |
Contractor | Single | Supply, Fabrication & Installation of Permanent Platform for De-oiling |
2015 | Completed | |
42 | Petron Gulf LLC Sultanate of Oman (J-159FB) |
SCA-107-15 Orpic – Sohar Refinery Improvement Project, Sohar |
Contractor | Single | Supply, Fabrication & Painting of Pipe Supports works |
2015 | Completed | |
43 | Suez - Tractebel Operation & Maintenance Oman LLC (STOMO), Sohar Sultanate of Oman (J-161FB) |
PO#4600014595 Sohar Power & Desalination Project |
Contractor | Single | Chemical Cleaning Service Contract for HRSG Boiler#2 Unit (1 No) and HP & LP Super heater Tubes |
2015 | Completed | |
44 | Suez - Tractebel Operation & Maintenance Oman LLC (STOMO), Barka, Sultanate of Oman(J-191FB) |
PO#4600016181 Barka II Power & Desalination Project |
Contractor | Single | Chemical Cleaning Service Contract for HRSG Boiler Units (2 Nos) |
2015 | Completed | |
45 | Larsen & Toubro (Oman)LLC Sultanate of Oman (J-193FB) |
LTO /PTD /IZKI /LOI / CIV /O08400 /120 /132kv Grid station, Izki Phase-III |
Contractor | Single | Supply, Fabrication & Installation of Transformer & Capacitor Bank sheds. |
2015 | Completed | |
PAINTING AND COATING OIL & GAS PROJECTS | ||||||||
46 | Duqm Refinery Project-Package-2/GSP Oman |
8-2020-010015 | Contractor | Single | Surface Preparation & Painting with High Build Epoxy for External Coating of Casing Pipe for Buried Pipeline |
2020 | Completed | |
47 | PDO/ENERFLEX Middle East LLC/STS |
1631/PRP00116 | Contractor | Single | Grit blasting & Painting of Pipes /spools /Pipe Support & Steel Structure |
2020 | Completed | |
48 | TRD/STS/Duqm Refinery |
Ref# STS 1688/WNP1903 | Contractor | Single | Grit blasting & Painting of Pipes/spools/Pipe |
2020 | On-Going | |
49 | PDO/Worley Parson JV |
PO_4800077302 | Contractor | Single | Brine water tank internal coating |
2020 | On-Going | |
50 | Bahwan Engineering Company |
6500003047 | Contractor | Single | STOPAQ Coating at Marmul |
2020 | On-Going | |
51 | Target LLC |
ELECNOR / TARGET20001089 | Contractor | Single | Pipe painting |
2020 | Completed | |
52 | TECHNICAL TRADING COMPANY LLC |
A-PORD-3014432 | Contractor | Single | Grit blasting & Painting of Pipes /spools /Pipe Support & Steel Structure |
2019 | On-Going | |
53 | CC ENERGY DEVELOPMENT S.A.L (OMAN BRANCH) |
PA000251[PR002370] | Contractor | Single | Provision of Call off Contract for Painting Services Block-3 & 4 |
2018 | Completed | |
54 | Bahwan Engineering Company LLC @ Marmul Oman |
WO:6500001767 | Contractor | Single | Blasting & Painting of Pipes, Pipe spools, structures |
2016 | On-Going | |
55 | OICC, Oman |
OICC & C31/1161 |
Sub-contractor | Single |
Blasting, Painting & Coating for EMC – Lekhwair Project |
2015 | On-Going | |
56 | ARABIAN INDUSTRIES PROJECTS L.L.C (OMAN GAS COMPANY SAOC) |
40-2015-03-0030 | Contractor | Single | Shop blasting & Painting works for Pipe spools & Structures |
2015 | Completed | |
57 | Oman Oil Refineries and Petrochemicals Company LLC (Orpic) |
4600001383/LOA |
Contractor | Single | Grit blasting & Painting (Supply & Apply) Annual Maintenance Contract for Painting Services |
2015-2018 | Completed | |
58 | DAELIM/PETROFAC/PETRON (OMAN OIL REFINERIES AND PETROLEUM INDUSTRIES |
SCA-141-15/25/08/2015 |
Contractor | Single | Grit blasting & Painting (Supply & Apply) Annual Maintenance Contract for Painting Services |
2015-2018 | Completed | |
59 | Oman Oil Refineries and Petrochemicals Company LLC (Orpic) |
4600001383/LOA |
Contractor | Single | Grit blasting & Painting (Supply & Apply) Annual Maintenance Contract for Painting Services |
2015-2018 | Completed | |
60 | DAELIM/PETROFAC/PETRON (OMAN OIL REFINERIES AND PETROLEUM INDUSTRIES |
SCA-141-15/25/08/2015 |
Contractor | Single | Grit blasting & Painting (Supply & Apply) Annual Maintenance Contract for Painting Services |
2015-2018 | Completed | |
61 | TOWELL INFRASTRUCTURE PROJECTS COMPANY L.L.C (TIPCO) |
P.O No :160200066 |
Contractor | Single | Painting of CS pipe & fittings for sea water pipelines |
2015-2016 | Completed | |
62 | Oil Tanking ODFJELL Terminals & Co LLC |
OOTO-WO-CP1604-001 &OOT/1133/ Date 28/01/2016 | Contractor | Single | Internal Coating of Oil and Gas Storage Tank and External coating of Pipelines, Tanks and related Structures & Supply of Painting Crew |
2015-2016 | Completed | |
MECHANICAL MAINTENANCE OIL & GAS PROJECTS | ||||||||
63 | OCCIDENTAL OF OMAN, Sultanate of Oman |
MUK-CA-2015-24000064806 dated June 1st 2016 | Contractor | Single | De-sludging, Cleaning, Inspection, Coating & Anode Replacement Services of the static Equipment in Block 53/ 3 years contract |
2016 | Completed | |
64 | CC Energy Development (CCED) Oman Sultanate of Oman |
CCED-15-105- Tank Cleaning Services Block 3 and 4, Oman | Contractor | Single | Sludge/Sediment cleaning/ HP Het washing/ Degreasing/ Degassing |
2016 | Completed | |
65 | Arabian Industries Technical Services, Oman Sultanate of Oman |
AITS & AITS/03/001-3/2016/12 (Extension) | Sub-Contractor | Single | Provision of Mechanical Services |
2015 | Completed | |
66 | Oil Tanking ODFJELL Co LLC, Sohar, Oman Sultanate of Oman |
OOT/Sohar/2015/143 & 138 | Contractor | Single | Tank Cleaning for T-303 functional Test & re-certification of fire pump |
2015 | Completed | |
67 | GALFAR -PDO Qarnalam Operations Sultanate of Oman |
Contract# 07079800 – OFF Plot Delivery Contract | Sub-Contractor | Single | Fabrication/Welding /CS Pipe work & fitting of 6’’ FBE Coated pipeline =45 km |
2012 | Completed | |
68 | VALE OMAN, SOHAR Sultanate of Oman |
PO#4500405126 Installation of wind fence | Contractor | Single | Installation of Wind shield at VALE at Sohar, Oman/Special Trained manpower/Equipment supply |
2012 | Completed | |
69 | GALFAR, Oman Sultanate of Oman |
GALFAR & 07/O&G 826/12-OXY Contract No MUK-CA-2009-0053-A | Sub-Contractor | Single | Earth work/ Concrete work masonry /plaster /painting /Fencing / & gate & paving services etc. |
2012 | Completed | |
70 | GALFAR-OXY, Mukhaizna |
MUK-CA-2009-0053-A-Sub Contracting Works. | Sub-Contractor | Single | Civil/Earth work /Fencing |
2012-2013 | Completed | |
71 | VALE OMAN, SOHAR Sultanate of Oman |
PO#4500605561 on site work force services -Building maintenance | Contractor | Single | Services of civil building maintenance/ Up gradation & maintenance activities at VALE Oman, Sohar |
2012-2015 | Completed | |
72 | OXY – Mukhaizna, Oman |
MUK-SO-24000031713-Carrying out internal clean of sediment from tank | Contractor | Single | Oil & Gas pipeline oil spillage/soil cleaning/ Sediment cleaning/ waste management |
2011 | Completed | |
73 | OXY – Mukhaizna, Oman |
MUK-SO-24000017633- Carrying out internal clean of sediment from tank MUK-SO-24000017633 | Contractor | Single | Oil spillage removal /Soil cleaning /Sacrificial anode replacement /Inspection & holiday testing for existing coating 888888888/Tank coating |
2011 | Completed | |
74 | CCC-WOOD Group -PDO-EMC-Bhaja/Marmul South Oman |
C-31 /1163- South Oman Engineering & maintenance Contract | Sub-Contractor | Single | Maintenance Work /Concrete Work /Fencing & Gates /Earth Work |
2011-2016 | Completed | |
75 | GPDCO – Oman Al Gubrah Power & Desalination Co. SAOC, Muscat, Oman |
PO#03/2010 Cleaning, Maintenance Mechanical repair & Painting of Tanks | Contractor | Single | Scaffolding /Cleaning /Mechanical repair /Sand Blasting & Painting of water storage tanks |
2010-2011 | Completed | |
76 | OXY SAFAH, Oman Sultanate of Oman |
OXY & SWL -CA -2009-0025 | Contractor | Single | Well head & process valves maintenance works |
2009 | Completed | |
77 | GALFAR, Oman Sultanate of Oman |
GALFAR & 07 /O&G /798 /360 /12-PDO Contract No. C-31 /0603 Off Plot Delivery Contract | Sub-Contractor | Single | Off plot Delivery Contract – North Oman (Fahud-Yibal-Lekhuwair-Qarn Alam-& Kauther -10 Years Contract |
2009 | Completed | |
78 | OXY -OMAN North & Western, Oman |
SWL-CA-2009-0025 Well heads & Process Valves maintenance | Contractor | Single | Valve maintenance /testing /repair |
2009-2013 | Completed | |
79 | ORPIC – Oman Refineries & petrochemicals, Sohar, Oman |
PO#41009525- Support Services for LPG tanks inspection | Contractor | Single | Scaffolding /Maintenance turn around by Orpic /Torque Services /Replacement of gasket /Stud-bolts /Box up for TA schedules by Orpic |
2009-2010 | Completed | |
80 | OXY – Mukhaizna, Oman |
MUK-000745-EQUIPMENT & Crew Supply | Contractor | Single | Supply of Crane /water tanker /Tandem Axle Truck /pipe trailer /fork lift /extendable boom lift/pick up/banks man for crane |
2008-2009 | Completed | |
81 | SOHAR ALUMINIUM, SOHAR, SULTANATE OF OMAN |
Agreement No# 08.013- General civil repair and building maintenance services | Contractor | Single | Skilled manpower for Mechanical /Civil /E& I Services for various maintenance services /Construction 8/upgradation & extension of various mechanical & civil projects /Refurbishment & construction at Aluminum smelter & Port facility |
2008 | Continue | |
82 | GPDCO – Oman Al Gubrah Power & Desalination Co. SAOC, Muscat, Oman |
PO# Support & Maintenance services for Power Plant | Contractor | Single | Steam boiler /Gas turbine /Condenser /Pump / vessels & piping Repair & maintenance / civil & Mechanical activities |
2007-2013 | Completed | |
83 | AL HASSAN ENGINEERING -PDO Yibal, Fahud, Qarn-alam, North Oman, Sultanate of Oman |
Cont. No#C2K4089 North Oman campaign Maintenance Contract | Sub-Contractor | Single | Blasting /Painting of static equipment Tank, vessels, Separators & structures etc. Maintenance & Cleaning services for various plant utilities |
2002-2005 | Completed |